Public Roads

Project Name: 2004 Safety Area Improvements at Olympia Airport

Contract Amount: $2,200,000

Scope: New construction of two roads and runway safety area including TESC, clearing, excavation, grading, storm drainage, curbs, sidewalks, signage, and paving

Start/ Finish: April 2004/ September 2004

Project Owner: Port of Olympia


Project Name: Valley Avenue East & West Valley Highway East Improvements Project

Contract Amount: $1,800,000

Scope: Rehabilitation of existing roadway including demolition, excavation, grading, water system, sanitary sewer, storm drainage, traffic signals, curbs, sidewalks, signage, and paving

Start/ Finish: May 2005/ January 2006

Project Owner: City of Sumner represented by Parametrix Engineering


Project Name: Tacoma Various Street Improvements LID Project

Contract Amount: $900,000

Scope: Rehabilitation of existing roadway including clearing, demolition, excavation, grading, storm drainage, sanitary sewer, water system improvements, curbs, sidewalks, signage, and paving

Start/ Finish: May 2006/ July 2006

Project Owner: City of Tacoma


Project Name: Pioneer Way Arterial Improvement Project

Contract Amount: $550,000

Scope: Rehabilitation of existing roadway including clearing, demolition, excavation, grading, storm drainage, retaining wall, traffic signal, curbs, sidewalks, guardrail, signage, and paving

Start/ Finish: May 2004/ September 2004

Project Owner: City of Tacoma

Underground Utilities

Project Name: Firgrove Regional Pond

Contract Amount: $3,000,000

Scope: Construction of 22 acre-foot detention pond, excavation and removal of 140,000 cubic yards, 7,000 feet 24"-42" storm drain, traffic control, road restoration and improvements

Start/ Finish: September 2006/ January 2007

Project Owner: Pierce County Department of Public Works


Project Name: Water Main Replacement Project 2003-4

Contract Amount: $1,500,000

Scope: Approximately 12,000 LF water main replacement including demolition, traffic control, temporary and permanent asphalt patching

Start/ Finish: September 2005/ January 2006

Project Owner: Tacoma Water


Project Name: Alaska Street Arterial Improvement Project

Contract Amount: $750,000

Scope: Approximately 9,000 LF water main replacement including demolition, traffic control, temporary and permanent asphalt patching

Start/ Finish: July 2003/ May 2004

Project Owner: Tucci & Sons


Project Name: Leschi Rd SW/Weller Rd SW Storm Drain

Contract Amount: $280,000

Scope: Storm system removal and replacement including demolition, bypass pumping, traffic control, temporary and permanent asphalt patching

Start/ Finish: December 2004/ February 2005

Project Owner: City of Lakewood


Project Name: San Francisco Avenue Street Improvements

Contract Amount: $240,000

Scope: Storm system removal and replacement including conveyance and infiltration systems, curbs, sidewalks, and permanent asphalt paving

Start/ Finish: October 2003/ February 2004

Project Owner: City of Lakewood

Special Projects

Project Name: Foothill Trails -McMillin to Meeker

Contract Amount: $2,030,000

Scope: Over five miles of pedestrian trail construction including clearing, excavation, grading, artificial wetland construction, box culverts, storm drainage, restroom building, and paving

Start/ Finish: June 2004/ December 2005

Project Owner: Pierce County Department of Public Works


Project Name: Tacoma Landfill Access Improvement Project

Contract Amount: $2,000,000

Scope: Excavation, water system, sanitary sewer, storm drainage, methane gas system modifications and relocate, landfill cap repairs, installation of truck scale, crushed gravel base, asphalt paving

Start/ Finish: October 2006/ March 2007

Project Owner: City of Tacoma


Project Name: Lakota Creek Restoration Project

Contract Amount: $800,000

Scope: Streambed rehabilitation including clearing, temporary stream bypass, excavation, stream bank fill, streambed amendments, plantings, curbs, fencing, and paving

Start/ Finish: May 2004/ October 2004

Project Owner: City of Federal Way


Project Name: Tacoma Landfill Employee Pervious Parking Lot Expansion

Contract Amount: $675,000

Scope: Construction of parking lot including TESC, excavation, grading, storm drainage, subsurface drainage collectors, monitoring wells, curbs, and paving

Start/ Finish: November 2005/ March 2006

Project Owner: City of Tacoma


Project Name: Gravelly Lake Stormfilter Project

Contract Amount: $240,000

Scope: Installation of storm conveyance system and precast storm filter requiring sheet pile system, road and landscape restoration including curb, sidewalks, and asphalt paving

Start/ Finish: April 2004/ June 2004

Project Owner: City of Lakewood


Project Name: Camp Murray Box Culvert

Contract Amount: $100,000

Scope: Construct new box culvert including removal of existing culvert, clearing, excavation, construction of artificial streambed, fencing, and crushed gravel roadway

Start/ Finish: September 2001/ November 2001

Project Owner: Wagner Development Inc.

Residential Subdivisions

Project Name: Madison Heights

Contract Amount: $520,000

Scope: Topsoil strip, excavation, storm pond construction, retaining walls, water system, sanitary sewer, storm drainage, infiltration galleries, joint utility trench, curbs, sidewalks, asphalt paving

Start/ Finish: November 2005/ September 2006

Project Owner: Northwest Family Homes


Project Name: Sunset Gardens

Contract Amount: $460,000

Scope: Clear, grub, topsoil strip, excavation, storm pond construction, retaining walls, water system, sanitary sewer, storm drainage, joint utility trench, fencing, curbs, sidewalks, asphalt paving

Start/ Finish: December 2005/ December 2006

Project Owner: Jawir Kaur Deol

Completed Projects

Project Name:Tacoma Landfill White Goods Facility

Contract Amount:$1,970,000

Scope: Removal of preload, structural excavation, water system, sanitary sewer, storm drainage, methane gas system modifications and relocate, landfill cap repairs, grading, and crushed gravel base

Start/ Finish: July 2006 / December 2006

Project Owner: Merit Construction

Project Name: Puyallup Junior High School #7

Contract Amount: $1,360,000

Scope: Clear, grub, topsoil strip, cut/fill 60,000 cubic yards, structural excavation, water system, fire line, sanitary sewer, grease interceptor, storm drainage, grading, and crushed gravel base

Start/ Finish: December 2006 / September 2007

Project Owner: Commercial Structures Inc.


Project Name: Old Cannery Site Improvements

Contract Amount: $1,040,000

Scope: Rehabilitation of existing parking and driving areas including demolition, excavation, grading, water system, sanitary sewer, storm drainage, retaining walls, curbs, signage, and paving

Start/ Finish: August 2005 / January 2006

Project Owner: SKG LLC


Project Name: Puyallup Elementary School #23

Contract Amount: $800,000

Scope: Clear, grub, topsoil strip, cut/fill 40,000 cubic yards, structural excavation, water system, fire line, sanitary sewer, grease interceptor, storm drainage, grading, and crushed gravel base

Start/ Finish: April 2006 / September 2006

Project Owner: Commercial Structures Inc.


Project Name: Summit Corporate Park

Contract Amount: $840,000

Scope: Clear, grub, topsoil strip, cut/fill 50,000 cubic yards, structural excavation, water system, fire line, sanitary sewer, grease interceptor, storm drainage, grading, and crushed gravel base

Start/ Finish: September 2006 / March 2007

Project Owner: Pannatoni Construction


Project Name: Tacoma Landfill White Goods Facility Preload

Contract Amount: $450,000

Scope: Construct building pad preload, TESC, relocate 60,000 cubic yards onsite fill, road and pad grading, storm drainage, and crushed gravel surfacing

Start/ Finish: August 2005 / December 2005

Site Development Inc.

3819 100th St Sw #6B
Lakewood, WA 98499

Phone: 253-538-2981
Email: Contact Us

SDI is 100% Drug Free!

Safety is an attitude; accidents and injuries are always preventable. SDI combines well trained construction professionals with a no-tolerance drug free workplace to create the safest working environment this industry can offer. Our proactive approach continues to protect our people, as well as those around us, and has lead to the following accomplishments:

  • Proactive AGC Safety Team member
  • Full time Safety Support Officer and dedicated Safety Support van
  • Dynamic Safety Committee comprised of nonsupervisory SDI employees
  • 100% comprehensive drug testing program
  • Comprehensive site specific safety plan for each project
  • Onsite safety meetings at least once a week
  • 2007 AGC Safety Team Award for Top 25 Lowest EMR
  • 2007 L&I experience factor .6000

SDI owns several machines that are equipped with a GPS system and onboard computer. This combination is used to control grading operations more precisely than a human operator has ever been able in the past. The GPS-equipped machines make one pass over an area when older means and methods required several. The system enables our crews to perform mass cuts and fills while simultaneously fine grading the same area. By combining these two functions, critical time is cut out of the construction schedule on every project.

The rover pack gives our grade engineer immediate cut/ fill information at every spot on the project. For this reason, SDI operations require far less surveying, a cost savings we pass on to each client. Having immediate access to cut/ fill information at every spot on the project means that all slopes from toe to top are built correctly the first time. It also means that storm detention ponds and other dramatic site contours are built 100% per design the first time.